Aldi Regional Logistics Centre, Mitchelstown, Cold Storage

BAM Building / Cemdure 110

Client: BAM Building
Location: Mitchelstown
Product: Cemdure 110

Job Aldi Regional Logistics Centre, Mitchelstown, Co. Cork, Cold Storage
Client BAM Building
Main Contractor KZA, Germany
Description: ย  For the levelling of 2,300.00 mยฒ of cold storage, Cemdure 110 was supplied by SMET and installed by Fast Floor Screed Ltd at depths between 1 and 30mm. The entire floor was prepared and levelled in 4 days.ย Project demonstrates, once again,
best practice and fast turn-around to meet customer requirements.ย With over 25 years flooring construction experience, we specialise in the supply and fit of Self Levelling Floor Screeds and have a range of products that will suit anyย Residential,ย UFH,ย Self Build,ย Renovation,ย Office, Care Home,ย Commercialย orย Industrialย flooring project.